Schedules
A schedule triggers a package on a recurring basis, for example to synchronize data every night or to poll an
external system every five minutes. Schedules are configured in the Schedules tab and linked to a package with a
scheduled event. The package receives the event name scheduler.<trigger name> in the
event standard variable.
Cron syntax
A schedule follows cron syntax. It consists of five space-separated parts:
* * * * *
┬ ┬ ┬ ┬ ┬
│ │ │ │ │
│ │ │ │ └ day of week (0 - 7) (0 or 7 is Sun)
│ │ │ └───── month (1 - 12)
│ │ └────────── day of month (1 - 31)
│ └─────────────── hour (0 - 23)
└──────────────────── minute (0 - 59)
Examples:
* * * * * -> Every minute, every hour, every day
0 0 * * * -> Every day at 00:00
5 * * * * -> Every hour, 5 minutes past the full hour
*/5 * * * * -> Every 5 minutes
20,30 1 * * 1-5 -> Monday to Friday at 01:20 and 01:30
8,12,17 * * 1,3,5 -> At 08:00, 12:00 and 17:00 on Monday, Wednesday and Friday